{"id":23453,"date":"2026-09-10T14:48:29","date_gmt":"2026-09-10T12:48:29","guid":{"rendered":"https:\/\/www.stepv.upv.es\/?p=23453"},"modified":"2026-09-10T14:48:29","modified_gmt":"2026-09-10T12:48:29","slug":"edifici-ferrandiz-stepv-exigeix-mesures-davant-lestres-termic","status":"publish","type":"post","link":"https:\/\/www.stepv.upv.es\/va\/edifici-ferrandiz-stepv-exigeix-mesures-davant-lestres-termic\/","title":{"rendered":"Edifici Ferr\u00e0ndiz: STEPV exigeix mesures davant l&#8217;estr\u00e9s t\u00e8rmic"},"content":{"rendered":"<p>Des de STEPV, a trav\u00e9s de les nostres persones delegades de prevenci\u00f3, estem actuant davant la situaci\u00f3 d\u2019<strong>estr\u00e9s t\u00e8rmic que est\u00e0 patint el personal de l\u2019Edifici Ferr\u00e1ndiz del Campus d\u2019Alcoi<\/strong> per la prolongada avaria de l\u2019aire condicionat.<\/p>\n<p>Des de Manteniment ens han informat que la placa electr\u00f2nica reparada est\u00e0 previst que torne a estar operativa la setmana que ve. Mentrestant, hem reclamat la instal\u00b7laci\u00f3 de <strong>\u00abping\u00fcins\u00bb en els espais de treball que ho necessiten<\/strong>, i ens han confirmat que estan gestionant la compra de m\u00e9s equips.<\/p>\n<p>A m\u00e9s, <strong>STEPV reclamarem a la Direcci\u00f3 de l\u2019Escola que, mentre no es puguen garantir unes temperatures adequades, es facilite el teletreball de tot el personal \u2014PTGAS, PDI i PI\u2014<\/strong>, tal com ja es va fer a l\u2019Escola de Gandia. En el cas del PDI, tamb\u00e9 demanem que es facilite la doc\u00e8ncia en l\u00ednia quan siga possible.<\/p>\n<p><strong>La reparaci\u00f3 de l\u2019aire condicionat no pot ser l\u2019\u00fanica resposta. La UPV ha de garantir unes condicions de treball segures mentre persista el problema.<\/strong><\/p>\n<p>STEPV continuar\u00e0 fent seguiment de la situaci\u00f3 i exigint les mesures preventives necess\u00e0ries.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Des de STEPV, a trav\u00e9s de les nostres persones delegades de prevenci\u00f3, estem actuant davant la situaci\u00f3 d\u2019estr\u00e9s t\u00e8rmic que est\u00e0 patint el personal de l\u2019Edifici Ferr\u00e1ndiz del Campus d\u2019Alcoi per la prolongada avaria de l\u2019aire condicionat. Des de Manteniment ens han informat que la placa electr\u00f2nica reparada est\u00e0 previst que torne a estar operativa [&hellip;]<\/p>\n","protected":false},"author":785,"featured_media":328,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[843662,843672],"tags":[],"class_list":["post-23453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-campus-de-gandia-i-alcoi","category-prevencio-i-salut-laboral"],"_links":{"self":[{"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/posts\/23453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/users\/785"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/comments?post=23453"}],"version-history":[{"count":2,"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/posts\/23453\/revisions"}],"predecessor-version":[{"id":23455,"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/posts\/23453\/revisions\/23455"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/media\/328"}],"wp:attachment":[{"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/media?parent=23453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/categories?post=23453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.stepv.upv.es\/va\/wp-json\/wp\/v2\/tags?post=23453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}